You are not logged in.
Announcement
Unanswered posts
|
Pages: 1

Hi,
I have two jobs. Both the job need to write to the same output file. I want both the values in the file.
The issue is that the second job is over writing what ever the first job has written.
Any idea how to get this resolved.
Please find the image attached.
Thank you
Achyuth
Offline
Pages: 1