You are not logged in.
Announcement
Unanswered posts
|
Pages: 1

Hi,
I created a job in TOS 4.2.2 with a db connection and three infinite loops that suppose to run subjobs at different times (meaning there is no link between the components).
For some reason only one of the loops runs. what can I do?
Offline
Pages: 1