• Index
  •  » Talend Open Studio for Data Integration » Usage, Operation
  •  » Multiple Infinite Loops in the Same Job.

#1 2011-08-30 11:48:12

ydary
Member
Registered: 2011-03-21
Posts: 16

Multiple Infinite Loops in the Same Job.

Hi,
I created a job in TOS 4.2.2 with a db connection and three infinite loops that suppose to run subjobs at different times (meaning there is no link between the components).
For some reason only one of the loops runs. what can I do?

Offline

#2 2011-08-30 15:16:38

ydary
Member
Registered: 2011-03-21
Posts: 16

Re: Multiple Infinite Loops in the Same Job.

Solved this by checking 'use multiple threads' in job settings.

Offline

#3 2011-08-31 10:36:34

pcoffre
Talend Team
Registered: 2009-03-26
Posts: 528
Website

Re: Multiple Infinite Loops in the Same Job.

Hello ydary,

Thanks for the feedback!

Best,
Pcoffre.


Follow Talend on Twitter, Linkedin, Facebook and the forum.
Download and try Talend solutions

Offline

  • Index
  •  » Talend Open Studio for Data Integration » Usage, Operation
  •  » Multiple Infinite Loops in the Same Job.

Board footer

Powered by FluxBB