You are not logged in.
Announcement
Unanswered posts
|

Hi,
is there any way I can automatically execute my jobs at the same time or at least successively like each 5mins, because the good execution of some jobs depends on the results of some others, actually I've got no idea how to use tloop or any other component. here's a photo of my jobs
http://www.freeimagehosting.net/ppmqp
(they are not assembled in a project they are each one apart). I will be so grateful for any help.
thanks a lot.
Last edited by fantom (2012-05-28 11:34:37)
Offline

Hi pedro,
Thanks a lot for your help and your quick answer
. indeed the jobs are executed depending on the time set. but actually my problem is that I'm expecting the jobs to be executed with no need to open talend. is there any way I can do this? (inside or outside talend?). thanks a lot for your attention and your help.
fantom.
Offline

Hi Fantom
Got it.
For commercial version, the job conductor of Talend Administration Center is available to arrang jobs and trigger jobs successively.
When it comes to Open Studio, you might export the job and use Windows Task Scheduler(Or Linux crontab) to trigger the JobName_run.bat.
Regards,
Pedro
Offline